?

Log in

No account? Create an account
May 16, 2006 Destruction Begins The tub was removed and… - mikeshelby [entries|archive|friends|userinfo]
mikeshelby

[ userinfo | livejournal userinfo ]
[ archive | journal archive ]

[May. 16th, 2006|08:12 pm]
mikeshelby





May 16, 2006

Destruction Begins

The tub was removed and stored to be reinstalled later.  Then the glass wall and door were removed from the shower along with all of the surrounding tile.  A very good end to the first day.  Today the remaining tile on the floor and around the sink was removed as was the soffit over the shower.  Tomorrow they remove the remaining wall along side the shower to install the power and cable outlets for a TV and replace the drywall with wall board.  The leak under the shower was quite large but thankfully did not leave any structural damage to the supporting floor under the bath.  The carpenter ant nest was found in the shower wall on the exterior side of the house.  Great Lakes Pest Control did a great job because none of the ants were left alive when nest was found.

linkReply